Block of 54 Units – Turramurra

5 Livistonia Palm Beach – Concrete floor was replaced along with earthenware drainage as root penetration was causing blockages. We reinstated and used a new travertine tile to add some internal class in keeping with the stone exterior. The fixtures will be reinstalled and be operational for the weekend.